Mellitah Oil and Gas
Wafa Desert Plant Production Enhancement
525 KM in Southern West part of Libya adjacent to the Libyan-Algerian boarder

Company Intended to increase Wafa Desert Plant Sales Gas production from its design capacity of 531,000 SM3/h to 584,000 SM3/h (Defined as Stage-1).
In order to achieve this objective, the scope of work outlines the requirements upon which the CONTRACTOR shall carry out the WORKS and other SERVICES for the replacement of some pressure Relief valves; the works/services include but are not limited to site survey, engineering, procurement and supply of all materials related to piping and mechanical, construction and installation.
In order to achieve this objective, the scope of work outlines the requirements upon which the CONTRACTOR shall carry out the WORKS and other SERVICES for the replacement of some pressure Relief valves; the works/services include but are not limited to site survey, engineering, procurement and supply of all materials related to piping and mechanical, construction and installation.