Sarir Oil Field – J22 Gas Utilization Project

In 2016, as a result of the improvement of the political situation in Libya, AGOCO (Arabian Gulf Oil Company) relaunched the flares gas recovery project in several SARIR Sites (located in the eastern part of the country, about 600km south of Benghazi) with a view to use the gas as fuel for the power plant of its GRAMA water pumping unit (located about 300km West of SARIR) to the Mediterranean coast. The key events and / or dates of this ongoing project are:
Engineering and Laser Scanning surveys were executed
Project kick-off
30% completion of the 3D model for all Sites achieved.
60% completion of the 3D model for all Sites
90% completion of the 3D model for all sites
Start-up of the installation