Nafoora Oil Field

Trunk Lines for K, L and O Areas
Sarir Oil Operations

Nafoora Oil Field – As Sarah Gas Lift Repair Project

portfolio_7
Formerly Wintershall Libya (WILI) GOSP Jakhira, Concession 96 – Gas Lift Repair (GLR) Project
  • The new gaslift plant is installed to maintain the actual oil production of the As Sarah oil field at a plateau of 100,000 BPD. The gaslift plant provides gas for 19 wells and is designed for a total supply capacity of 40 MMSCFD at the wells.
  • This project repair works and newly laid pipelines that replaced the ones which were damaged in the 2017 explosion incident.
  • Its successful completion of the Gas Lift Repair(GLR) Project – AUGUST 2021