Mellitah Oil and Gas
El Feel Oil Field - Gas Oil Separation Plant
Formerly LASMO Grand Maghreb Limited F-NC-174 (Elephant) Development Project – EPC for GOSP
September / October 2016
Engineering and Laser Scanning surveys were executed

This project consisted of the engineering, procurement, installation/construction, pre-commissioning and commissioning of the following:
- Pipeline 75 km of a 24” export pipeline from the Elephant field FNC 174 GOSP to the existing NC-115 facilities and 12 km of Trunk lines from well sites to GOSP, 40 km of a water injection line and Electrical 80 km OHTL from Elephant Field FNC 174 GOSP facilities to existing NC-115 locations and various well pad areas, switchyards, transformers, etc. Main Civil.
- All building and civil construction works regarding the accommodation, maintenance and utility facilities complete with electrical, mechanical, H.V.A.C systems. Also, road works, pavements and landscaping, for the operation of LASMO’S GOSP (now Mellitah Oil and Gas) Project NC-174 at Elephant Field.
- Since the NC-174 Field lies in an archeologically sensitive area, it was essential to minimize the development footprints where possible and where safety was not jeopardized, in a way that only previously disturbed areas were utilized.