Akakus Oil Operations
El Sharara Oil Field – Gathering Station, Oil Station and Water Injection Manifolds

Execution of the following field facilities at the El-Sharara Development Project’s NC-115, NC-186 and IR fields:
- Gathering Stations: 13 Nos.
- Oil Gathering Manifolds: 45 Nos. 235-slots total.
- Water Injection Manifolds: 17 Nos. 141-slots total.